Worldgate Mixed Use Facility Phase II

Reston, Virginia
Owner: Charles E. Smith
Architect: Davis & Carter
Engineer: General Engineering
Contract Value: $3.5 Million

This 650,000 square foot mixed use complex contains hotel space, a gymnasium with racket ball and tennis courts, a swimming pool, exercise area, several retail locations, and covered garages.  This type of facility requires the installation of a wide range of systems, all of which were successfully installed by Pierce Associates.

The mechanical systems on this job included two 370 ton chillers, two self contained air-conditioning units, 13 air handling units, one air conditioning units for pool service, and various fans and roof hoods.  This wide variety of equipment required excellent coordination and communication to make sure all of the equipment was properly located.